VOLTALIA: SBE Triton (French Guiana)
As part of the SBE Triton project in French Guiana, SERA delivered a Class A wood storage and handling solution for a 40 MW biomass plant. The installation comprises A-Frame silos combined with tubed screw reclaiming technology.
With a total storage capacity of 5,000 m³, the installation manages the fuel and ensures a steady supply to the boiler. This reference illustrates SERA's expertise in designing large-capacity biomass storage solutions tailored to the specific constraints of energy projects in French Guiana.
With a total storage capacity of 5,000 m³, the installation manages the fuel and ensures a steady supply to the boiler. This reference illustrates SERA's expertise in designing large-capacity biomass storage solutions tailored to the specific constraints of energy projects in French Guiana.
Project data
Boiler power
40 MW
Commissioning
2025
Storage volume
4,000 m3 + 1,000 m3 Class A wood
Reclaiming technology
A-Frame silo with tubed screw