Project Details
ENGIE: Novawood (Laneuveville-devant-Nancy)
For ENGIE's Novawood project in Laneuveville-devant-Nancy, SERA delivered a wood biomass storage and handling installation for a 60 MW energy unit.
The project comprises three 2,500 m³ circular silos, i.e. a total capacity of 7,500 m³, equipped with planetary screw reclaiming systems. The installation is designed to handle different fuels, including Class B and Class C wood.
This project illustrates SERA's experience in high-power industrial biomass installations with large storage capacities.
The project comprises three 2,500 m³ circular silos, i.e. a total capacity of 7,500 m³, equipped with planetary screw reclaiming systems. The installation is designed to handle different fuels, including Class B and Class C wood.
This project illustrates SERA's experience in high-power industrial biomass installations with large storage capacities.
Project data
Boiler power
60 MW
Commissioning
2022
Storage volume
3 x 2,500 m3 Class B and C wood
Reclaiming technology
Circular silo with planetary screw